 |
Shoveling driveway at 807 Franklin St, Watertown, NY. Working slow but steady I was finished a little less than an hour & half. |
It is Wednesday December 28, 2022. The snow has finally stopped. There is a thaw coming. 50 degrees before the week in through. It is the 7th day of the Better Half being in the hospital recovering from a broken femur. She received some lovely flowers from my sisters today. The flowers should have arrives a few days ago but delivery stalled for those days because of the blizzard. This was first chance I had to shovel the snow on my daughter S' sidewalk. A plow truck cleared her driveway yesterday ad in the course of it created a huge snowbank that I had to shovel through. I started at 10:43 and never thought to snap a starting photo until 10:54, so the digging had already commenced. I finished at 12:09. That's about an hour and a half. I worked slowly and methodically. I chopped and crumbled the hard packed snow with a steel coal shovel. I then scooped up the resulting piles with a plastic snow shovel. My goal was to bare the sidewalk so the mailman could get from the driveway to the mailbox on her front porch.
 |
Shoveling driveway at 807 Franklin St, Watertown, NY. Working slow but steady I was finished a little less than an hour & half. |
 |
Shoveling driveway at 807 Franklin St, Watertown, NY. Working slow but steady I was finished a little less than an hour & half. |
 |
Shoveling driveway at 807 Franklin St, Watertown, NY. Working slow but steady I was finished a little less than an hour & half. |
 |
Shoveling driveway at 807 Franklin St, Watertown, NY. Working slow but steady I was finished a little less than an hour & half. |
No comments:
Post a Comment
Please leav comments and suggestions about this blog and how I maght improve it. Thanks, Gary Walts